Monday, August 11, 2008

 
It has taken a couple of weekends, so far, but we have made some good progress on preparing the Muth's house for siding. The old outside storage area was redesigned to be accessible from inside the garage. That meant replacing the load-bearing wall with a beam (and it is massive, but that was easier than building a standard sized one). The old doors were replaced by a wall, and storage shelves have been built inside. (This will allow Jenny & Michael to put some of the stuff from inside their house in this area, and ready a place for the new baby). We also replaced the back door with a wider one. A few more changes are needed in the garage, but we are about ready for siding.





Comments:
We should call you Dan the handy man. You are really flying threw the projects.
 
Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?